Project Start Date: Fall 2019
Construction Start Date: Fall 2024
Project Completion Date: Fall 2025
Project Description:
The Âé¶¹´«Ã½ Student Housing facility will be built on a previously undeveloped site on the southeast portion of campus near the Fine Arts Complex. 

The Electric Vehicle Charging Infrastructure project at Âé¶¹´«Ã½ (Âé¶¹´«Ã½) expands sustainable transportation options by upgrading and installing charging capacity across campus. Through Southern California Edison’s (SCE) Charge Ready Program, the project delivers DSA-approved design and complete infrastructure installation at no cost to the college beyond purchasing the charging stations.

When complete, along with the (4) existing EV stations in Lot 8, Âé¶¹´«Ã½ will have a total of 58 EV charging stations supporting up to 109 electric vehicles, located in key campus parking areas to serve students, staff, and visitors. Key project components include:

  • Replacement of old transformers and installation of two new transformers for Parking Lots 5 and 8
  • Replacement of the main electrical panel.
  • Full energization and connection to the grid.
  • Installation of 54 new EV chargers as part of the campus-wide charging network upgrade.
  • Sustainable design to encourage the use of clean transportation options.

This expanded EV charging network directly supports Âé¶¹´«Ã½â€™s commitment to sustainability, reduces campus carbon emissions, and enhances accessibility for the growing number of electric vehicle drivers in the campus community.